A01 Westautobahn - Road Shoulder Construction near Haag km 151.200 - 158.000
Published 26 March 2026
Location
Haag, Austria
Suggested bid value
~EUR 800,000
Source
usp
Description
This tender concerns construction work focused on the road shoulder (Bankett) along a section of the A01 Westautobahn near Haag, Austria. The project scope covers a 6.8 km stretch (kilometer 151.200 to 158.000). Contractors should anticipate earthmoving activities to reshape the shoulder, paving to resurface or strengthen it, and likely drainage improvements to manage water runoff. The absence of specific CPV codes or deadline information makes it difficult to fully assess the requirements. Given the location on a major autobahn, traffic management will be a critical consideration, potentially involving phased construction and significant safety measures. The lack of a specified region may require contacting the procuring entity for clarification.
Original description
Construction work on the road shoulder (Bankett) of the A01 Westautobahn near Haag, between kilometer markers 151.200 and 158.000. This likely involves earthworks, paving, and drainage improvements.
Deutsch
A01 Westautobahn - Bankettbauarbeiten bei Haag km 151.200 - 158.000
Bauarbeiten an der Bankett der A01 Westautobahn in der Nähe von Haag, zwischen den Kilometermarkierungen 151.200 und 158.000. Dies beinhaltet wahrscheinlich Erdarbeiten, Pflasterarbeiten und Verbesserungen der Entwässerung.
Français
A01 Westautobahn - Construction d'accotement près de Haag km 151.200 - 158.000
Travaux de construction sur l'accotement de l'A01 Westautobahn près de Haag, entre les bornes kilométriques 151.200 et 158.000. Cela comprend probablement des travaux de terrassement, de pavage et d'amélioration du drainage.