Bridge Renovation: Electrical, Mechanical, and Control System Upgrade
Published 28 March 2026
Location
Spijkenisse, Alblasserdam, Zuid-Holland, Zuid-Holland, Netherlands
Deadline
1 September 2022
Deadline passed
Suggested bid value
~EUR 8,000,000
Source
tenderned
Description
This Dutch public works tender covers the complete overhaul of electrical, mechanical, and control systems for two bridges: the Spijkenisserbrug in Spijkenisse and the Brug over de Noord in Alblasserdam, both located in the Zuid-Holland region. Work will involve removing existing systems and installing new or renovated replacements, likely including cabling, switchgear, motors, sensors, PLC or similar control hardware, and associated software. Bidders must factor in ongoing maintenance during the construction phase and a further six-month maintenance period after the bridges are reopened.
The project's scale is indicated by the involvement of two separate bridge structures, suggesting a significant workload and logistical complexity. The 'general' trade designation may imply a main contractor role with subcontracting responsibilities. The maintenance requirement adds another layer of complexity. While specific CPV codes are unavailable for precise categorization, the combination of electrical, mechanical, and control system work suggests a multi-disciplinary approach is essential. The tender's listed publication date is in the future and the deadline is in the past, indicating there may be an error with the data.
Original description
This project involves the replacement and renovation of electrical, mechanical, and control systems for the Spijkenisserbrug and Brug over de Noord bridges. It also includes ongoing maintenance during the renovation and for 6 months post-opening.
Deutsch
Brückensanierung: Upgrade von Elektrik, Mechanik und Steuerungssystem
Dieses Projekt umfasst den Austausch und die Renovierung von Elektro-, Mechanik- und Steuerungssystemen für die Spijkenisserbrug- und Brug over de Noord-Brücken. Es beinhaltet auch die laufende Wartung während der Renovierung und für 6 Monate nach der Eröffnung.
Français
Rénovation de pont : mise à niveau des systèmes électriques, mécaniques et de contrôle
Ce projet comprend le remplacement et la rénovation des systèmes électriques, mécaniques et de contrôle des ponts Spijkenisserbrug et Brug over de Noord. Il comprend également la maintenance continue pendant la rénovation et pendant 6 mois après l’ouverture.