Building Automation System Installation for Community Center in Pasing
Published 19 March 2026
Location
München, Bavaria, Germany
Suggested bid value
~EUR 750,000
Source
oev
Description
This tender from Munich, Bavaria (Germany) concerns the installation of a Building Automation System (BAS) specifically targeting heating and ventilation control within a community center located in Pasing. The project involves all necessary wiring and integration work. The size of the heating system, indicated by approximately 750 data points, suggests a medium-sized system. The ventilation system appears more extensive, with approximately 2793 data points, potentially indicating a complex or multi-zone setup.
The overall project involves a significant amount of integration and programming of the BAS to manage the identified data points. Contractors should assess their experience with similar-sized heating and ventilation systems, specifically regarding BAS implementation. Given the lack of a published deadline, interested parties should promptly investigate this detail to determine bid feasibility. The project is categorised as HVAC (heating, ventilation, and air conditioning), which is a relatively common trade in public procurement, so competition is expected.
Without CPV codes or a detailed scope, it is difficult to be precise, but the large number of data points suggests a sophisticated system. Ensure adequate resources are available for system configuration, testing, and commissioning, in addition to the physical installation work. Prior experience working with similar data point volumes will be beneficial.
Original description
Installation of heating and ventilation control systems including wiring for a community center. The heating system has approximately 750 data points and the ventilation system approximately 2793 data points.
Deutsch
Installation Gebäudeautomationssystem für Kulturbürgerhaus Pasing
Installation von Heizungs- und Lüftungsregelsystemen inklusive Verkabelung für ein Kulturbürgerhaus. Das Heizungssystem hat ca. 750 Datenpunkte und das Lüftungssystem ca. 2793 Datenpunkte.
Français
Installation d'un système d'automatisation du bâtiment pour un centre communautaire à Pasing
Installation de systèmes de contrôle du chauffage et de la ventilation, y compris le câblage, pour un centre communautaire. Le système de chauffage comporte environ 750 points de données et le système de ventilation environ 2793 points de données.