DE Electrical Open

Building Automation System Reconstruction at School

Published 8 March 2026

location_on

Location

Schleiden, North Rhine-Westphalia, Germany

auto_awesome

Suggested bid value

~EUR 150,000

source

Source

oev

Description

This public procurement project based in Schleiden, North Rhine-Westphalia, Germany, focuses on upgrading the building automation system (BAS) within a school. For an electrical contractor, the work involves the complete reconstruction, which likely includes removing old systems and installing new automation stations, wiring and connecting a variety of sensors and actuators across the school building. The core tasks are implementing control functions for heating, ventilation, and air conditioning (HVAC), lighting, and potentially other building services. The project requires providing a centralized visualization interface and operation for the BAS, indicating a modern, user-friendly system is expected. The school setting suggests potential constraints regarding working hours and minimizing disruption to school activities. Coordination with other trades might be necessary to accommodate installations and commissioning phases. The absence of a published deadline requires further investigation.

The scale is likely medium, involving a comprehensive BAS upgrade rather than piecemeal repairs. The complexity hinges on the existing infrastructure and the school's specific needs. If the school building is old, integration with legacy systems and unforeseen electrical infrastructure issues could increase complexity. The lack of CPV codes limits accurate assessment but suggests focusing on electrical installation, control systems, and potentially some degree of software configuration. The location in Germany implies high quality standards and rigorous adherence to building codes and safety regulations. Further information regarding the building size and the required level of automation is needed to evaluate the scale accurately.

Original description

This project involves the installation and integration of a building automation system (BAS) to centrally monitor, control, and regulate the school's technical equipment. This includes installing automation stations, connecting sensors and actuators, implementing control functions, and providing visualization and operation interfaces.