Building Strip-Out, Asbestos Removal and Selective Demolition
Published 16 March 2026
Location
Centre-Val de Loire, France
Deadline
13 April 2026
25 days remaining
Suggested bid value
~EUR 350,000
Source
boamp
Description
This public procurement opportunity in France focuses on building deconstruction and hazardous material removal. The project requires contractors to strip out interior fixtures and safely remove asbestos, followed by selective demolition of the building structure. Bidders must be capable of handling both abatement and demolition work as a single package. The absence of a specified location within Centre-Val de Loire necessitates thorough pre-bid site visits to assess accessibility, local regulations regarding asbestos disposal, and any site-specific complexities impacting cost and scheduling. The deadline for submission is relatively tight, offering less than a month for bid preparation. Contractors without established asbestos removal credentials and demonstrable experience in French demolition projects should carefully consider the risks and required resources before committing to a bid.
Original description
This project involves the removal of interior fixtures and asbestos from a building, followed by selective demolition work. Contractors should bid on the entire scope of work.
Deutsch
Entkernung, Asbestsanierung und selektiver Rückbau eines Gebäudes
Dieses Projekt umfasst die Entfernung von Inneneinrichtungen und Asbest aus einem Gebäude, gefolgt von selektiven Abbrucharbeiten. Auftragnehmer sollten für den gesamten Arbeitsumfang bieten.
Français
Travaux de curage, désamiantage et démolition sélective d'un bâtiment
Ce projet implique le curage, le désamiantage et la démolition sélective d'un bâtiment. Les entrepreneurs doivent soumissionner pour l'ensemble des travaux.