Construction of 2 Bicycle Bridges
Published 25 March 2026
Location
Antwerpen, BE211, Belgium
Deadline
11 May 2026
45 days remaining
Suggested bid value
~EUR 2,500,000
Source
ted
Description
This tender from Antwerpen, Belgium (BE211), concerns the construction of two bicycle bridges. The contractor will be responsible for providing all labor, materials, and equipment necessary for the complete execution of the project. The lot description confirms the project involves the realization (Dutch: *Realisatie*) of two bicycle bridges, implying design and build or build-only depending on the tender documents themselves, which should be closely examined.
The inclusion of CPV codes 45233100 (Construction of highways, roads, streets, and railways), 45221113 (Bridge construction work) and 45200000 (Complete or part construction work and civil engineering work) reinforces the core scope. Codes 45100000 (Site preparation work), and 45110000 (Demolition, site preparation and earthmoving work) indicate preliminary site works might be needed. With a deadline of May 11, 2026, following publication on March 25, 2026, contractors have approximately six weeks to prepare a tender. The absence of a published contract value in the tender notice makes preliminary financial evaluation more challenging.
Given the 'road' trade classification and the bicycle bridge construction scope, potential bidders should assess their capabilities in bridge engineering, material procurement (steel, concrete, etc.), and relevant environmental and safety regulations specific to Antwerpen. A key factor for bidding consideration will be the full tender documentation detailing the specific technical requirements, design specifications, and potential logistical challenges associated with constructing two bridges in the Antwerpen area.
Original description
This project involves the construction of two bicycle bridges. Contractors are required to provide all necessary labor, materials, and equipment.
Deutsch
Bau von 2 Fahrradbrücken
Dieses Projekt umfasst den Bau von zwei Fahrradbrücken. Auftragnehmer müssen alle erforderlichen Arbeitskräfte, Materialien und Geräte bereitstellen.
Français
Construction de 2 ponts pour vélos
Ce projet comprend la construction de deux ponts pour vélos. Les entrepreneurs doivent fournir toute la main-d'œuvre, les matériaux et l'équipement nécessaires.