Construction of 21 Apartments and 11 Townhouses with Site Work
Published 6 March 2026
Location
Saint-Paul, FRY40, France
Deadline
13 April 2026
3 days remaining
Suggested bid value
~EUR 6,500,000
Source
ted
Description
This French public procurement opportunity, located in Saint-Paul (FRY40 region), involves the construction of a residential complex comprising 21 apartment units and 11 townhouses. The project scope is comprehensive, covering a wide range of construction activities. The published Lot descriptions indicate work packages for: site preparation and earthworks (Terrassements généraux - VRD - Clôtures), structural work and hard finishes (Gros oeuvre - Revêtements durs), waterproofing (Etanchéité), roofing and cladding (Charpente - Couverture - Bardage), interior insulation and drywall (Cloisons sèches - Faux plafonds - Isolation intérieure), interior and exterior carpentry/joinery (Menuiseries intérieures bois, Menuiseries extérieures aluminium & PVC), metalwork (Métallerie), painting and flooring (Peinture - Revêtements souples), electrical and plumbing services including fire protection and ventilation (Electricité CF/cf, Plomberie - Sanitaires - Protection incendie - Ventilation), solar hot water production (Production Eau chaude solaire), low voltage systems and external lighting (Basse tension - Colonnes montants - Eclairages extérieurs) and elevator installation (Ascenseur).
The presence of numerous CPV codes and separate work packages suggest that this is a multi-trade project and potentially suitable for general contractors or those with the capacity to manage multiple sub-contractors. The deadline for submissions is April 13, 2026, providing a reasonable window for preparing a bid. The project's complexity arises from the integration of multiple building systems and the coordination required between various trades. Contractors bidding should ensure they possess the necessary qualifications and experience in managing similar residential construction projects in France.
Original description
This project involves the construction of 21 apartment units and 11 townhouses, including site preparation, utility connections, and fencing.