PL General Open

Construction of a Biowaste Fermentation and Composting Plant

Published 20 March 2026

location_on

Location

Koleczkowo, PL634, Poland

schedule

Deadline

9 April 2026

18 days remaining

auto_awesome

Suggested bid value

~EUR 12,000,000

source

Source

ted

Description

This tender concerns the design, construction, and commissioning of a new biowaste treatment facility in Koleczkowo, Poland, within the PL634 region. The project involves two main components: a methane fermentation plant for biowaste and a composting facility specifically designed to stabilize the 0-80mm undersized fraction. The scope extends beyond just the core processing units, including the construction of necessary associated infrastructure (e.g., utilities, access roads), supply of mobile equipment to handle materials, and crucially, obtaining all required permits for operation. The work is to be carried out at the existing "EKO DOLINA" plant in Łężyce.

The sheer number of CPV codes, encompassing general construction (45000000), architectural and engineering services (71220000 series), electrical, plumbing and heating (45300000 series), and site preparation work (45100000 series), suggests a project requiring a multidisciplinary team. Key tasks include the design and construction of specialized process buildings, installation of fermentation and composting equipment, electrical and mechanical works, and site landscaping. The reference to "wstępnej eksploatacji" (initial operation) indicates that the selected contractor will also be responsible for a period of commissioning and operational handover.

The deadline for submission is April 9, 2026. Contractors should carefully assess their capabilities in delivering integrated waste treatment solutions, obtaining environmental permits in Poland, and managing a complex project with multiple disciplines.

Original description

This tender is for the design, construction, and commissioning of a biowaste fermentation plant and a composting facility. It includes related infrastructure, mobile equipment supply, and obtaining necessary permits.

Deutsch

Bau einer Biowaste-Fermentations- und Kompostierungsanlage

Diese Ausschreibung umfasst die Planung, den Bau und die Inbetriebnahme einer Biowaste-Fermentationsanlage und einer Kompostierungsanlage. Dies beinhaltet die zugehörige Infrastruktur, die Lieferung mobiler Geräte und die Einholung der erforderlichen Genehmigungen.

Français

Construction d'une usine de fermentation et de compostage de biodéchets

Cet appel d'offres concerne la conception, la construction et la mise en service d'une usine de fermentation de biodéchets et d'une installation de compostage. Il comprend l'infrastructure associée, la fourniture d'équipements mobiles et l'obtention des permis nécessaires.

Classification

45000000 71220000 71221000 71242000 79421000 45100000 45111200 45113000 45220000 45330000 45231300 45232130 45232410 45251143 45252000 45330000 45332200 45332300 45331000 45310000 45311000 45315100 45315300 45317200 45320000 45200000 45222000 45262300 45400000 45233120 45233140 45233200 45233220 45233226 45233250 45111291 45112710 45400000 45500000 45000000 71220000 71221000 71242000 79421200 45100000 45111200 45113000 45220000 45330000 45231300 45232130 45232410 45251143 45252000 45330000 45332200 45332300 45331000 45310000 45311000 45315100 45315300 45317200 45320000 45200000 45222000 45262300 45400000 45233120 45233140 45233200 45233220 45233226 45233250 45111291 45112710 45400000 45500000