DE General Open

Construction of a Combined Heat and Power (CHP) Plant at Wastewater Treatment Facility

Published 25 March 2026

location_on

Location

Neubrandenburg, brandenburg, Germany

schedule

Deadline

21 April 2026

27 days remaining

auto_awesome

Suggested bid value

~EUR 5,000,000

source

Source

bund.de

Description

This tender concerns the complete construction of a new combined heat and power (CHP) plant located at a wastewater treatment facility in Neubrandenburg, Brandenburg, Germany. As a general contractor, you will be responsible for all aspects of the project, presumably including civil works, structural engineering, mechanical and electrical installations, and commissioning. The 'ground up' designation suggests a greenfield project, potentially involving site preparation, foundations, and utilities connections. The project's complexity stems from integrating the CHP plant within an existing wastewater treatment facility, requiring careful coordination to minimize disruption.

The absence of CPV codes hinders a precise assessment, but a CHP plant construction project necessitates expertise in energy generation, grid connection, and potentially biogas utilization, depending on the fuel source. The short timeframe between publication and the deadline (less than one month) indicates a compressed bidding period and may signal a fast-track project with demanding timelines for completion. Thorough due diligence and a robust project plan are crucial for successful participation. Note that there is no published contract value, which will require contractors to carefully prepare a cost build-up.

As this is in Germany, the contractor will need to comply with German standards and regulations, including environmental protection and occupational safety. The public procurement process will be rigorous and transparent, requiring detailed documentation and compliance with all stated requirements.

Original description

This tender is for the construction of a new combined heat and power (CHP) plant at an existing wastewater treatment facility. The project involves building the plant from the ground up.

Deutsch

Bau eines Blockheizkraftwerks (BHKW) für eine Kläranlage

Diese Ausschreibung betrifft den Neubau eines Blockheizkraftwerks (BHKW) auf dem Gelände einer bestehenden Kläranlage. Das Projekt umfasst den kompletten Neubau der Anlage.

Français

Construction d'une centrale de cogénération (CHP) pour une station d'épuration

Cet appel d'offres concerne la construction d'une nouvelle centrale de cogénération (CHP) sur le site d'une station d'épuration existante. Le projet comprend la construction complète de l'installation.