Construction of a Hybrid Building (Concrete and Wood) for a Primary School
Published 5 January 2026
Location
Gehrden, Lower Saxony, Germany
Suggested bid value
~EUR 800,000
Source
oev
Description
This tender from Gehrden, Lower Saxony, Germany, concerns the structural work for a primary school extension, specifically the construction of a hybrid building utilizing both reinforced concrete and timber. This suggests the contractor will be responsible for both concrete and timber frame construction elements, including foundations, load-bearing walls, floors, and potentially the roof structure, depending on the detailed design. The complexity lies in coordinating these two distinct materials and construction methods within a single project. Given it's a primary school, stringent safety standards and potentially specific acoustic or fire-resistance requirements are likely. While no deadline or specific CPV codes are provided, it's essential to investigate these further as well as to determine the complete scope of required construction work, including any unusual elements or site constraints.
As a primary school project, the need for integration with existing school infrastructure and minimization of disruption during construction should be anticipated. Hybrid construction requires specialized expertise in both concrete and timber engineering, design, and execution, demanding skilled personnel. Limited information necessitates thorough due diligence before deciding whether to bid, including obtaining access to detailed specifications, drawings, and tender documents. Pay close attention to any environmental requirements stipulated by the public body, especially concerning sustainable sourcing of timber and waste management.
Original description
Construction of a hybrid building using both concrete and wood for the structural work of a primary school. This project includes both reinforced concrete and timber construction elements.