Construction of a New Montessori School with Gymnasiums
Published 24 March 2026
Location
Amsterdam, Noord-Holland, Netherlands
Deadline
30 March 2026
5 days remaining
Suggested bid value
~EUR 8,000,000
Source
tenderned
Description
A public procurement opportunity has been published in Amsterdam, Noord-Holland, Netherlands, for general contractors. The project entails design and construction of a new educational facility comprising a Montessori school (approximately 2,345 m2) and two gymnasiums (approximately 1,269 m2). You will be responsible for producing detailed design and construction drawings based on pre-existing specifications.
The scale of the project, totaling approximately 3,765 m2, suggests a medium to large construction undertaking. Design-build projects inherently introduce complexity due to the combined responsibility for both design and execution. A key factor to consider is the extremely short tender period: responses are due within six days of publication. The absence of published CPV codes makes it harder to immediately identify similar projects and specific regulatory requirements or building standards that may apply.
The tender period is remarkably short and may indicate a fast-track project or a preference for contractors already familiar with the procuring entity.
Original description
This project involves the construction of a new Montessori school (approx. 2,345 m2) and two gymnasiums (approx. 1,269 m2), totaling approximately 3,765 m2. The contractor will be responsible for developing the detailed design and construction drawings based on provided specifications.
Deutsch
Bau einer neuen Montessori-Schule mit Turnhallen
Dieses Projekt umfasst den Bau einer neuen Montessori-Schule (ca. 2.345 m2) und zweier Turnhallen (ca. 1.269 m2), insgesamt ca. 3.765 m2. Der Auftragnehmer ist für die Erstellung der Detailplanung und der Konstruktionszeichnungen auf der Grundlage der vorgelegten Spezifikationen verantwortlich.
Français
Construction d'une nouvelle école Montessori avec gymnases
Ce projet comprend la construction d'une nouvelle école Montessori (environ 2 345 m2) et de deux gymnases (environ 1 269 m2), pour un total d'environ 3 765 m2. L'entrepreneur sera responsable de l'élaboration de la conception détaillée et des dessins de construction sur la base des spécifications fournies.