ES Electrical Open

Construction of a Self-Consumption Photovoltaic Power Plant

Published 16 March 2026

location_on

Location

Ejea de los Caballeros, Aragon, Spain

schedule

Deadline

17 April 2026

29 days remaining

euro

Estimated value

EUR 2,902,070.14

source

Source

placsp

Description

This tender concerns the complete construction of a self-consumption photovoltaic power plant near Ejea de los Caballeros in Aragon, Spain. Contractors should anticipate works covering all aspects of PV plant construction as detailed in the project documentation, encompassing likely tasks such as site preparation, mounting structure installation, panel mounting and electrical connections, in addition to grid connection and commissioning. Specifics regarding the plant's capacity (kWp), panel type, inverter specifications, and mounting configuration are unknown from the provided data but will be crucial for bid preparation.

The listed tender value of approximately €2.9 million suggests a medium to large-scale commercial PV installation. Given the location (Laverné, near Ejea de los Caballeros), contractors should investigate potential logistical challenges related to accessing the site and any applicable regional regulations or permits specific to photovoltaic projects in Aragon. The short timeframe of roughly one month between publication and the tender deadline requires a rapid assessment of project documentation and bid preparation. Further scrutiny of the full tender details is necessary to evaluate complexity indicators such as grid connection requirements, performance guarantees, and any specific environmental considerations.

Original description

This tender is for the construction of a self-consumption photovoltaic power plant in Laverné, near Ejea de los Caballeros. The project includes all necessary works outlined in the project documentation.

Deutsch

Bau eines Photovoltaik-Kraftwerks zur Eigenversorgung

Diese Ausschreibung betrifft den Bau eines Photovoltaik-Kraftwerks zur Eigenversorgung in Laverné, nahe Ejea de los Caballeros. Das Projekt umfasst alle notwendigen Arbeiten, die in der Projektdokumentation aufgeführt sind.

Français

Construction d'une centrale photovoltaïque d'autoconsommation

Cet appel d'offres concerne la construction d'une centrale photovoltaïque d'autoconsommation à Laverné, près d'Ejea de los Caballeros. Le projet comprend tous les travaux nécessaires décrits dans la documentation du projet.

info

Spain's PLACSP portal may require a Spanish digital certificate (certificado electrónico) to view tender details. The link above takes you to the public search page where you can look up this tender by its reference number: Z250005.

Related tenders

ES electrical

Installation of Solar Photovoltaic System for Energy Community

This tender is for the installation of a solar photovoltaic system for collective self-consumption by the Membrío energy community. The project is located in Membrío, Extremadura.

place Membrío, Extremadura

schedule 8 Apr

ES electrical

Photovoltaic Installation at Cruz Chiquita Nursery

Installation of a photovoltaic (solar panel) system at the Cruz Chiquita Nursery. The project is located in San Sebastián de La Gomera.

place San Sebastián de La Gomera, Canary Islands

schedule 26 Mar

ES electrical

New Efficient Lighting Installation for Port Area

Installation of new, energy-efficient lighting in the maritime zone of the Mineral Loading Dock at the Port. The project involves electrical work.

place Melilla, Melilla

schedule 14 Apr

ES electrical

Electrical Installation for Laundry Equipment at Ibiza Parador

Installation of a new electrical connection and protection panels for laundry equipment at the Parador de Turismo in Ibiza. This project requires electrical work.

place Madrid, Madrid

schedule 26 Mar

ES electrical

Power Upgrade at Substation for Desalination Plant

This project involves upgrading the power capacity at a substation (Abonado 3215) that serves the Mogán desalination plant. The work will take place in Mogán.

place Mogán, Canary Islands

schedule 10 Apr

ES electrical

Fire Alarm System Upgrade at Justice Center

This project involves upgrading the central fire alarm system at the Justice Center. Contractors are needed to migrate and update the existing system.

place Zaragoza, Aragon

schedule 6 Apr