Construction of In-Ground Weighbridge and Retaining Wall
Published 18 March 2026
Location
Pawłowice, Southern Poland, Poland
Deadline
2 April 2026
14 days remaining
Suggested bid value
~EUR 150,000
Source
bzp
Description
The tender concerns the construction of an in-ground weighbridge and a prefabricated retaining wall within the Selective Waste Collection Point in Pawłowice, Southern Poland. This suggests civil engineering work including excavation, foundation construction suitable for a weighbridge, installation of the weighbridge itself and associated technical infrastructure (likely involving electrical and potentially data connections), and the assembly of a prefabricated retaining wall. As it's at a waste collection point, anticipate dealing with existing utilities and potentially contaminated ground during excavation. The retaining wall's purpose suggests managing earth pressure, so its size will be a crucial factor in assessing material and labor costs. The project's focus on functional infrastructure at a waste collection point implies adherence to specific environmental and safety regulations will be necessary during construction.
The 'general' trade designation means the contractor will likely be responsible for coordinating all aspects of the project, potentially including subcontracting for specialized elements like weighbridge calibration and electrical connections. The lack of published CPV codes limits a precise categorization, but the short description suggests the project's complexity is moderate, requiring competence in civil engineering, precise installation of specialized equipment, and adherence to relevant regulations. The relatively short timeframe between publication and deadline (approximately two weeks) requires a quick assessment of available resources and a prompt response.
Original description
Construction of an in-ground weighbridge with necessary technical infrastructure and a prefabricated retaining wall at the Selective Waste Collection Point.
Deutsch
Bau einer Unterflur-Fahrzeugwaage und Stützmauer
Bau einer Unterflur-Fahrzeugwaage mit der erforderlichen technischen Infrastruktur und einer vorgefertigten Stützmauer am Wertstoffhof.
Français
Construction d'un pont-bascule encastré et d'un mur de soutènement
Construction d'un pont-bascule encastré avec l'infrastructure technique nécessaire et d'un mur de soutènement préfabriqué au point de collecte sélective des déchets.