Construction of Multimodal Path Connecting Salinas del Astur and La Bota Beach
Published 23 March 2026
Location
Lepe, Andalusia, Spain
Deadline
13 April 2026
22 days remaining
Estimated value
EUR 394,184.72
Source
placsp
Description
This Spanish public procurement tender concerns a construction contract in Lepe, Andalusia, for a multimodal path connecting Salinas del Astur and La Bota Beach. The project is funded by NextGeneration E.U. funds, which likely implies specific reporting and compliance requirements related to the funding source. The short timeframe between the publication date (March 23, 2026) and the deadline (April 13, 2026) suggests a relatively straightforward project or a streamlined procurement process. Contractors will need to rapidly assess the tender documents once available to determine the exact scope of work, required materials, and specific environmental or accessibility considerations.
The published value of EUR 394,184.72 provides an indication of the project's scale. It is a relatively small project, suggesting a limited length of path and associated features. However, the absence of detailed CPV codes necessitates a thorough review of the tender documentation to understand the exact scope, including any specialized requirements related to the terrain, potential coastal erosion mitigation, or integration with existing infrastructure. Understanding the 'multimodal' aspect will be key – does it involve pedestrian, cycle, or potentially other modes of transport?
Given the location and the NextGeneration E.U. funding, contractors should anticipate a focus on sustainability and environmental impact. Familiarity with Spanish construction regulations and relevant EU directives related to infrastructure projects will be essential for a successful bid. Contractors should evaluate their capacity to mobilize quickly and meet the potentially stringent reporting requirements associated with E.U. funding.
Original description
Construction contract for a multimodal path project connecting Salinas del Astur to La Bota Beach in Punta Umbría, Huelva. This project is funded by NextGeneration E.U.
Deutsch
Bau eines multimodalen Weges zur Verbindung von Salinas del Astur und La Bota Strand
Bauvertrag für ein multimodales Wegprojekt, das Salinas del Astur mit dem Strand La Bota in Punta Umbría, Huelva, verbindet. Dieses Projekt wird von NextGeneration E.U. finanziert.
Français
Construction d'un chemin multimodal reliant Salinas del Astur et la plage de La Bota
Contrat de construction pour un projet de chemin multimodal reliant Salinas del Astur à la plage de La Bota à Punta Umbría, Huelva. Ce projet est financé par NextGeneration E.U.
Spain's PLACSP portal may require a Spanish digital certificate (certificado electrónico) to view tender details. The link above takes you to the public search page where you can look up this tender by its reference number: 2492/2026.