PL Road/Civil Open

Construction of Timber Roads in Sopotnia Forests

Published 27 March 2026

location_on

Location

Sopotnia Wielka, PL225, Poland

schedule

Deadline

14 April 2026

16 days remaining

auto_awesome

Suggested bid value

~EUR 85,000

source

Source

ted

Description

This tender concerns the construction of 500 meters of timber roads, specifically "dylówki," within the Sopotnia Dolna forestry area in Poland. The road will be 3.2 meters wide and built using round, unbarked timber beams with an average diameter of 18cm. The work involves anchoring these beams into the ground to create the load-bearing structure of the road on designated parcels. The project is located within a single 500m section across several parcels, suggesting the site may involve challenging terrain or limited access typical of forestry environments.

The main complexity arises from the use of specific natural materials (round, unbarked timber) and the need for proper anchoring, which suggests a focus on durability and environmental integration. Contractors should have experience with forestry road construction, timber handling, and potentially specialized equipment for installing and anchoring the timber beams. The relatively short deadline also indicates a need for prompt mobilization and efficient execution.

The CPV codes suggest related activities might involve site preparation, earthworks, and potentially planning/design aspects, though the primary focus is on the timber road construction itself. Contractors will need to review the full tender documentation for specific requirements related to environmental permits, material sourcing, and construction standards applicable to forestry roads in Poland.

Original description

Construction of 500 meters of timber roads (dylówki) in the Sopotnia Dolna forestry area. The road will be 3.2 meters wide and constructed using round, unbarked timber beams anchored in the ground.

Deutsch

Bau von Holzwegen in den Wäldern von Sopotnia

Bau von 500 Metern Holzwegen (Dylówki) im Forstgebiet Sopotnia Dolna. Die Straße wird 3,2 Meter breit und aus runden, unentrindeten Holzbalken gebaut, die im Boden verankert sind.

Français

Construction de chemins forestiers en bois à Sopotnia

Construction de 500 mètres de chemins forestiers en bois (dylówki) dans la zone forestière de Sopotnia Dolna. La route fera 3,2 mètres de large et sera construite à l'aide de poutres en bois rondes non écorcées, ancrées dans le sol.

Classification

45000000 45233140 45111200 71250000 45000000 45000000 45000000

Related tenders

PL road

Road Repair: Pastwiska - Koszary Access Road

Repair work on the Pastwiska - Koszary access road (road number 350218W). This involves general road maintenance and improvements.

place Iłża

schedule 16 Apr

PL road

Road repair on municipal road 270761K in Łużna

This tender is for the repair of municipal road 270761K in Łużna. The works are divided into two sections: from km 0+008.00 to km 1+060.00 and from km 1+188.00 to km 1+465.00.

place Łużna

schedule 15 Apr

PL road

Road Reconstruction on Fosforytowa Street, Kielce (approx. 510m)

Reconstruction of approximately 510 meters of Fosforytowa Street in Kielce, from Podklasztorna Street to the intersection with Krzemionkowa Street. This project is part of the city's road improvement program.

place Kielce, Southern Poland

schedule 17 Apr

PL road

Road and Bicycle Path Construction in Kuźmina - Krościenko, Poland

Construction project involves expanding road number 890 and building pedestrian and bicycle paths between Liskowate and Krościenko. The work includes bridge expansion, culvert construction, and repairs.

place PL821

schedule 10 Apr

PL road

Construction of Local Road No. 117684L in Hańsk-Kolonia

Construction of local road No. 117684L from km 0+003.30 to km 0+929.50 in Hańsk-Kolonia. This project involves building a section of road in a rural area.

place Hańsk Pierwszy

schedule 10 Apr

PL road

Road Reconstruction in Skotniki Dolne (780m)

Reconstruction of an internal road in Skotniki Dolne, Poland, spanning 780 meters. The project covers the section from kilometer 0+000 to kilometer 0+780.

place Wiślica, Southern Poland

schedule 10 Apr