FR Demolition Open

Demolition and Waterproofing of Summer Pool Roof

Published 16 March 2026

location_on

Location

Loulay, Nouvelle-Aquitaine, France

schedule

Deadline

7 April 2026

12 days remaining

auto_awesome

Suggested bid value

~EUR 80,000

source

Source

boamp

Description

This French public procurement opportunity requires a contractor to demolish an existing roof at the Loulay summer swimming pool in the Nouvelle-Aquitaine region and install a new waterproofing system. The project scope encompasses both demolition and waterproofing trades, implying that the winning bidder will need expertise or subcontracting arrangements to cover both aspects. Given the nature of the project - a swimming pool roof - access and logistical considerations might present challenges. The deadline for submission is April 7th, 2026, providing a relatively short timeframe to prepare a competitive bid. Due to the absence of published CPV codes, contractors should carefully examine the full tender documentation to fully understand all technical specifications and compliance requirements.

Original description

This project involves demolishing the existing roof and installing a new waterproofing system for the Loulay summer swimming pool. Contractors will be responsible for both the demolition and the new roof waterproofing.

Deutsch

Abbruch und Abdichtung des Sommerpool-Dachs

Dieses Projekt umfasst den Abriss des bestehenden Daches und die Installation eines neuen Abdichtungssystems für das Sommerbad in Loulay. Die Auftragnehmer sind sowohl für den Abbruch als auch für die neue Dachabdichtung verantwortlich.

Français

Déconstruction et étanchéité de la toiture de la piscine d'été

Ce projet consiste à déconstruire la toiture existante et à installer un nouveau système d'étanchéité pour la piscine d'été de Loulay. Les entreprises seront responsables de la démolition et de l'étanchéité de la nouvelle toiture.

Related tenders

FR demolition

Demolition and Cleaning Work for Eviction Operations

This tender is for demolition and cleaning services required as part of eviction operations. Contractors will be responsible for demolishing structures and cleaning up debris.

FR demolition

Asbestos Removal for Thermal Renovation Project

This project involves asbestos removal work as part of a larger thermal renovation and accessibility upgrade of the Bois Jauni halls. Contractors will be responsible for safe and compliant asbestos abatement.

place Pays de la Loire

schedule 20 Apr

FR demolition

Demolition and Asbestos Removal at Former AFPA Site

This project involves the demolition and asbestos removal of a building at the former AFPA site. The location is 02 avenue Montaigne in Beauvais.

place Beauvais, Hauts-de-France

schedule 28 Apr

FR demolition

Asbestos Removal of Floor Tiles at Lycée Bel Air

This project involves the removal and remediation of asbestos-containing floor tiles in the corridors of the CD-Lycée Bel Air building. The work is located in Tinténiac.

place Tinténiac, Bretagne

schedule 28 Apr

FR demolition

Building Strip-Out and Asbestos Removal on Rue de Paris

This tender is for the strip-out and asbestos removal work required on a building located on Rue de Paris. Contractors must be qualified to handle asbestos.

place Le Pecq, Ile-de-France

schedule 13 Apr

FR demolition

Asbestos Removal, Demolition, Pollution Management, and Fencing

This project involves asbestos removal, demolition of existing structures, management of concentrated pollution sources, and installation of new fencing. Contractors will need to handle hazardous materials and ensure site safety.

place Hauts-de-France

schedule 13 Apr