Demolition and Waterproofing of Summer Pool Roof
Published 16 March 2026
Location
Loulay, Nouvelle-Aquitaine, France
Deadline
7 April 2026
12 days remaining
Suggested bid value
~EUR 80,000
Source
boamp
Description
This French public procurement opportunity requires a contractor to demolish an existing roof at the Loulay summer swimming pool in the Nouvelle-Aquitaine region and install a new waterproofing system. The project scope encompasses both demolition and waterproofing trades, implying that the winning bidder will need expertise or subcontracting arrangements to cover both aspects. Given the nature of the project - a swimming pool roof - access and logistical considerations might present challenges. The deadline for submission is April 7th, 2026, providing a relatively short timeframe to prepare a competitive bid. Due to the absence of published CPV codes, contractors should carefully examine the full tender documentation to fully understand all technical specifications and compliance requirements.
Original description
This project involves demolishing the existing roof and installing a new waterproofing system for the Loulay summer swimming pool. Contractors will be responsible for both the demolition and the new roof waterproofing.
Deutsch
Abbruch und Abdichtung des Sommerpool-Dachs
Dieses Projekt umfasst den Abriss des bestehenden Daches und die Installation eines neuen Abdichtungssystems für das Sommerbad in Loulay. Die Auftragnehmer sind sowohl für den Abbruch als auch für die neue Dachabdichtung verantwortlich.
Français
Déconstruction et étanchéité de la toiture de la piscine d'été
Ce projet consiste à déconstruire la toiture existante et à installer un nouveau système d'étanchéité pour la piscine d'été de Loulay. Les entreprises seront responsables de la démolition et de l'étanchéité de la nouvelle toiture.