Elevator Replacement and Shaft Adaptation at Zduńska Wola Hospital
Published 19 March 2026
Location
Zduńska Wola, Poland
Deadline
3 April 2026
14 days remaining
Suggested bid value
~EUR 180,000
Source
bzp
Description
The Zduńska Wola County Hospital is tendering a general contracting project for the replacement of an existing elevator and the adaptation of the existing elevator shaft. This implies demolition and removal of the old elevator, structural modifications to the shaft to accommodate the new lift, and installation of a new elevator system. Work includes all associated electrical, mechanical, and finishing trades needed for a functional elevator installation within a hospital environment. Given the setting, stringent safety protocols, minimal disruption to hospital operations, and adherence to healthcare-specific regulations regarding hygiene and accessibility will be essential.
Complexity stems from working within an existing structure, requiring careful planning and execution to minimize disturbance. The project's scale is suggested to be relatively modest, involving only one elevator unit, but hospital projects often have rigorous quality control and inspection requirements. The rapid turnaround time, from publication to deadline (approximately two weeks), indicates that the contracting authority may be seeking a prompt response and potentially, a quick project commencement. Missing CPV codes and regional information adds uncertainty.
Original description
This project involves replacing an existing elevator and adapting the elevator shaft within the Zduńska Wola County Hospital. This is a general contracting project.
Deutsch
Aufzugsaustausch und Schachtanpassung im Krankenhaus Zduńska Wola
Dieses Projekt umfasst den Austausch eines bestehenden Aufzugs und die Anpassung des Aufzugsschachts im Kreiskrankenhaus Zduńska Wola. Es handelt sich um ein Generalunternehmerprojekt.
Français
Remplacement d'ascenseur et adaptation de la gaine à l'hôpital de Zduńska Wola
Ce projet consiste à remplacer un ascenseur existant et à adapter la gaine d'ascenseur à l'hôpital de district de Zduńska Wola. Il s'agit d'un projet d'entrepreneur général.