Fibre Optic Cable Installation (Submarine & Terrestrial) - Fuerteventura & Lanzarote

Published 18 March 2026

location_on

Location

Granadilla de Abona, Canary Islands, Spain

schedule

Deadline

20 March 2026

1 days remaining

euro

Estimated value

EUR 1,456,396.96

source

Source

placsp

Description

This tender concerns the installation of fibre optic cables across both submarine and terrestrial environments on the islands of Fuerteventura and Lanzarote in the Canary Islands. The project's geographic scope, covering multiple municipalities across two islands, suggests significant logistical challenges related to workforce deployment, material transportation, and permitting. Contractors should anticipate managing construction activities across diverse environments, potentially including marine environments requiring specialized vessels and terrestrial areas demanding excavation and reinstatement works. Given the combination of marine and terrestrial elements, a contractor with experience in both submarine cable laying and conventional civil engineering for cable installation is likely preferred.

The project value is fixed at EUR 1,456,396.96. The extremely short deadline – just over two days from publication – strongly suggests this is a restricted or accelerated procedure. Contractors considering bidding must have all necessary documentation and resources readily available for immediate submission. The short turnaround likely favors established players already familiar with the region or those pre-qualified on relevant framework agreements. The lack of CPV codes in the tender notice necessitates further investigation to fully understand the specific technical requirements and applicable standards.

Original description

Construction work for installing fibre optic cables, both underwater and on land. The project spans multiple municipalities on the islands of Fuerteventura and Lanzarote.

Deutsch

Glasfaserkabelinstallation (Unterwasser & Terrestrisch) - Fuerteventura & Lanzarote

Bauarbeiten zur Installation von Glasfaserkabeln, sowohl unter Wasser als auch an Land. Das Projekt umfasst mehrere Gemeinden auf den Inseln Fuerteventura und Lanzarote.

Français

Installation de câbles à fibre optique (sous-marin et terrestre) - Fuerteventura et Lanzarote

Travaux de construction pour l'installation de câbles à fibre optique, à la fois sous-marins et terrestres. Le projet s'étend sur plusieurs municipalités des îles de Fuerteventura et de Lanzarote.

info

Spain's PLACSP portal may require a Spanish digital certificate (certificado electrónico) to view tender details. The link above takes you to the public search page where you can look up this tender by its reference number: CANALINK-2026-01.

Related tenders

ES electrical

Installation of Solar Photovoltaic System for Energy Community

This tender is for the installation of a solar photovoltaic system for collective self-consumption by the Membrío energy community. The project is located in Membrío, Extremadura.

place Membrío, Extremadura

schedule 8 Apr

ES electrical

Photovoltaic Installation at Cruz Chiquita Nursery

Installation of a photovoltaic (solar panel) system at the Cruz Chiquita Nursery. The project is located in San Sebastián de La Gomera.

place San Sebastián de La Gomera, Canary Islands

schedule 26 Mar

ES electrical

New Efficient Lighting Installation for Port Area

Installation of new, energy-efficient lighting in the maritime zone of the Mineral Loading Dock at the Port. The project involves electrical work.

place Melilla, Melilla

schedule 14 Apr

ES electrical

Electrical Installation for Laundry Equipment at Ibiza Parador

Installation of a new electrical connection and protection panels for laundry equipment at the Parador de Turismo in Ibiza. This project requires electrical work.

place Madrid, Madrid

schedule 26 Mar

ES electrical

Power Upgrade at Substation for Desalination Plant

This project involves upgrading the power capacity at a substation (Abonado 3215) that serves the Mogán desalination plant. The work will take place in Mogán.

place Mogán, Canary Islands

schedule 10 Apr

ES electrical

Fire Alarm System Upgrade at Justice Center

This project involves upgrading the central fire alarm system at the Justice Center. Contractors are needed to migrate and update the existing system.

place Zaragoza, Aragon

schedule 6 Apr