Fire Safety System Upgrade at Rambouillet Hospital
Published 13 March 2026
Location
Rambouillet, Ile-de-France, France
Suggested bid value
~EUR 750,000
Source
boamp
Description
This French public procurement tender concerns a complete upgrade of the fire safety system at the Centre Hospitalier de Rambouillet, a hospital facility located in the Ile-de-France region. As a "general" trade project, this likely involves the supply, installation, testing, and commissioning of new fire detection and alarm systems, fire suppression systems (sprinklers, extinguishers, etc.), emergency lighting, and possibly fire-resistant structural upgrades depending on existing infrastructure and updated code requirements. Contractors should anticipate coordinating with hospital staff to minimize disruption to operations during the upgrade. The unknown deadline will need to be determined before deciding to bid.
The project scale appears medium, determined by hospital size and system scope, but the complexity could be high. Hospital environments demand stringent safety protocols, specialized equipment knowledge, and meticulous documentation. Contractors require experience in healthcare settings with similar fire safety system upgrade projects in France, particularly experience with local regulations and standards (e.g., APSAD rules). Lack of listed CPV codes could indicate the tender is relatively new and key details are not yet available. Interested contractors should review the full tender documentation as soon as available, paying attention to any specific product or vendor requirements.
Given the unknown value and lack of detailed CPV codes, it is important to investigate what the budget will allow for. The project may be funded by national or regional organizations, which will be defined in the tender documents. The scope may include design, so it may be important to determine if it's design and build, or a design-bid-build project.
Original description
This tender is for the renewal of the fire safety system at the Centre Hospitalier de Rambouillet. The work involves a complete upgrade of the existing system.