BE General Open

Flood Expansion Zone Construction on the Thyle River

Published 25 March 2026

location_on

Location

Villers-la-Ville, Walloon Brabant, Belgium

auto_awesome

Suggested bid value

~EUR 1,500,000

source

Source

bda

Description

This Belgian public works tender, located in Villers-la-Ville, Walloon Brabant, involves the construction of a flood expansion zone on the Thyle River. Practically, this entails significant earthmoving operations to create a holding capacity of around 25,000 cubic meters. The project also includes building a dam, installing control structures to regulate water flow, reinforcing riverbanks to prevent erosion, constructing paths for access and maintenance, and providing necessary signage.

Given the multifaceted nature of the project – spanning earthworks, hydraulic engineering, and civil construction – coordination and expertise across multiple disciplines will be crucial. The requirement for control structures and bank protection suggests the need for specialized knowledge in hydraulic engineering and potentially the use of specific materials or techniques. The absence of a specific deadline necessitates prompt action upon release of full tender documents to assess feasibility and prepare a competitive bid.

Although the tender value is not provided, the scope of works indicates a project of moderate complexity. The unspecified CPV codes highlight the importance of careful evaluation of the full tender specifications to ensure comprehensive understanding of all requirements.

Original description

Construction of a flood expansion zone with a volume of approximately 25,000 m³ on the Thyle River. The works include earthworks, a dam, control structures, bank protection, path construction, and signage.

Deutsch

Bau einer Hochwasser-Ausdehnungszone am Fluss Thyle

Bau einer Hochwasser-Ausdehnungszone mit einem Volumen von ca. 25.000 m³ am Fluss Thyle. Die Arbeiten umfassen Erdarbeiten, einen Damm, Steuerungsstrukturen, Uferschutz, Wegebau und Beschilderung.

Français

Construction d'une zone d'expansion de crue sur la Thyle

Construction d'une zone d'expansion de crue d'un volume d'environ 25 000 m³ sur la rivière Thyle. Les travaux comprennent des terrassements, un barrage, des ouvrages de contrôle, une protection des berges, la construction d'un sentier et la signalisation.

Related tenders

BE general

Elevator Modernization and Maintenance at Justice Complex

This tender is for the modernization of a hydraulic elevator with a side machine room at a complex on Rue de la Résistance, followed by its ongoing maintenance.

place Huy, Liège

BE general

General Construction Work

This tender is for general construction work in the Hainaut region of Belgium. Further details will be provided in the tender documentation.

place Hainaut, Hainaut

BE general

Complete Renovation of Rooms at MPI Pottelberg Kortrijk

This project involves a complete renovation of rooms at the MPI Pottelberg facility. Contractors should be prepared to handle all aspects of the renovation work.

place Kortrijk, West Flanders

BE general

Stream Bank Restoration and Repair - Route d'Aubel

Repair and restore a stream bank (Bèfve) damaged by flooding on Route d’Aubel. Work includes tree removal, bank stabilization, rock placement, and site restoration.

place Thimister-Clermont, Liège

BE general

Complete Renovation of Rooms at MPI Pottelberg Kortrijk

This tender is for the complete renovation of rooms located at the MPI Pottelberg in Kortrijk. Contractors are required to submit bids for all aspects of the renovation work.

place Kortrijk, West Flanders

BE general

Coating and Covering of Influent Pump and Receiving Pit at Wulpen Wastewater Plant

This project involves coating the existing influent pump pit and receiving pit at the Wulpen wastewater treatment plant. It also requires providing a closed cover for both pits.

place Wulpen, West Flanders

schedule 22 May