Glycol System Upgrade & Office Heater Installation
Published 16 March 2026
Location
PL911, Poland
Deadline
25 March 2026
5 days remaining
Suggested bid value
~EUR 35,000
Source
ted
Description
This Polish public procurement tender focuses on HVAC work, specifically a glycol system upgrade and office heater installation. The project requires upgrading existing glycol systems with shut-off valves at heat recovery units. Additionally, it involves the supply and installation of heaters in specified office rooms, adhering to a predetermined design. Contractors should carefully review attachment #2 to the SWZ (Terms of Reference) for a detailed scope of work and attachment #9 (draft contract) to understand contractual obligations.
Scale and complexity are difficult to fully assess without the full tender documents. However, the 'HVAC' trade and 'glycol system upgrade' indicate a potentially specialised skillset requirement. The need for 'shut-off valves at heat recovery units' suggests work on existing systems, potentially involving shutdowns and integration with existing infrastructure. The heater installation component suggests a defined number of office rooms will be heated using a specific design.
Given the short deadline (9 days from publication), immediate action is necessary to assess the tender documents and prepare a compliant bid. Lack of a published value necessitates a careful cost estimate based on the documentation provided in attachments 2 and 9.
Original description
This project involves upgrading glycol systems with shut-off valves at heat recovery units, and purchasing/installing heaters in some office rooms based on a specific design.
Deutsch
Glykolsystem-Upgrade & Installation von Büroheizkörpern
Dieses Projekt umfasst die Aufrüstung von Glykolsystemen mit Absperrventilen an Wärmerückgewinnungsanlagen sowie den Kauf und die Installation von Heizkörpern in einigen Büroräumen gemäß einer bestimmten Planung.
Français
Mise à niveau du système de glycol et installation de radiateurs de bureau
Ce projet comprend la mise à niveau des systèmes de glycol avec des vannes d'arrêt au niveau des unités de récupération de chaleur, ainsi que l'achat et l'installation de radiateurs dans certains bureaux, conformément à une conception spécifique.