Historic industrial building restoration and reconstruction
Published 25 February 2026
Location
Bologna, Nord-Est, Italy
Deadline
9 March 2026
Deadline passed
Estimated value
EUR 8,998,555.01
Source
ted
Description
This tender from Bologna, Italy, seeks a general contractor to provide design and construction services for the restoration and reconstruction of a historic industrial building located at Viale del Risorgimento, 4. The project requires full lifecycle Building Information Modeling (BIM) implementation as specified in Article 43 of Legislative Decree 36/2023, suggesting a complex integrated project delivery approach. The Italian "Lot description" emphasizes the need for executive design and construction work using BIM methodologies for the refurbishment and recovery of the historical building of Industrial Chemistry.
Scale is indicated by the fixed published value of approximately EUR 8,998,555.01. The inclusion of CPV codes 45454000 (both codes given are the same) implies specialized restoration work. The relatively short timeframe between the publication date (February 25, 2026) and the deadline (March 9, 2026) suggests a need for rapid response and potentially a simplified or accelerated bidding process. Contractors should carefully consider their BIM capabilities, experience with historic building restoration in Italy, and ability to meet the tight deadline before deciding to bid.
Original description
Design and construction services for the complete restoration and recovery of a historic industrial building using BIM (Building Information Modeling) methodology and integrated project delivery.
Deutsch
Restaurierung und Umbau eines historischen Industriegebäudes
Design- und Konstruktionsleistungen für die vollständige Sanierung und Instandsetzung eines historischen Industriegebäudes mit BIM-Methodik (Building Information Modeling) und integrierter Projektabwicklung.
Français
Restauration et reconstruction d'un bâtiment industriel historique
Services de conception et de construction pour la restauration complète et la récupération d'un bâtiment industriel historique utilisant la méthodologie BIM (Modélisation des Informations du Bâtiment) et la livraison de projet intégrée.