HVAC Installation for Wilhelm-Raabe-Schule Attic Conversion and Renovation

Published 24 March 2026

location_on

Location

Lüneburg, Lower Saxony, Germany

auto_awesome

Suggested bid value

~EUR 850,000

source

Source

oev

Description

The project concerns the installation of heating, ventilation, and air conditioning systems at the Wilhelm-Raabe-Schule in Lüneburg, Lower Saxony, Germany. It is part of an attic conversion and renovation project. The core of the work involves equipping approximately ten classrooms, an assembly hall, and other unspecified rooms with HVAC systems. A key element is the construction of a new central HVAC unit located in the attic, with a specified air handling capacity of roughly 7,000 m3/h.

Based on the limited information available, the complexity seems moderate. The construction of a new central unit suggests significant mechanical engineering and installation work. The project requires coordination with the overall attic conversion and renovation, potentially involving integration with existing building systems. Contractors should be prepared for potential challenges related to working in an existing school building and fitting new systems within an older structure. Bidders should investigate the existing structural conditions and any specific energy efficiency requirements that may be mandated by German building codes.

Original description

This project involves installing HVAC systems in approximately ten classrooms, an assembly hall, and associated rooms during the attic conversion and renovation of the Wilhelm-Raabe-Schule. It includes the construction of a new HVAC central unit with a capacity of around 7,000 m3/h in the attic.

Deutsch

HLK-Installation für Wilhelm-Raabe-Schule Dachgeschossausbau und -umbau

Dieses Projekt umfasst die Installation von HLK-Anlagen in ca. zehn Klassenräumen, einer Aula und Nebenräumen im Zuge des Dachgeschossausbaus und der Sanierung der Wilhelm-Raabe-Schule. Es beinhaltet den Neubau einer zugehörigen RLT-Zentrale mit einer Leistung von ca. 7.000 m3/h im Dachgeschoss.

Français

Installation de CVC pour l'aménagement et la rénovation des combles de Wilhelm-Raabe-Schule

Ce projet consiste à installer des systèmes de CVC dans une dizaine de salles de classe, une salle de réunion et les pièces annexes lors de l'aménagement des combles et de la rénovation de l'école Wilhelm-Raabe-Schule. Il comprend la construction d'une nouvelle centrale de traitement d'air d'une capacité d'environ 7 000 m3/h dans les combles.

Related tenders

DE hvac

Heating System Renovation for Sports Hall

Renovation of the heating systems in a sports hall located on P.-Picasso-Str. in Rostock. This project involves upgrading or replacing the existing heating infrastructure.

place Rostock, Mecklenburg-Vorpommern

schedule 20 Apr

DE hvac

Energy Inspection of Air Conditioning Systems

This tender is for the legally required energy inspection of air conditioning systems as per §74 of the German Building Energy Act (GEG) 2024. Contractors will need to perform inspections to ensure compliance.

place Jülich, Nordrhein-Westfalen

schedule 20 Apr

DE hvac

Osnabrück University - Fire Protection Upgrade, Smoke Extraction System Installation

Installation of smoke extraction systems as part of a fire protection upgrade project at the Alte Münze building, Osnabrück University. This is the second phase of the building 10 renovation.

place Osnabrück, niedersachsen

schedule 21 Apr

DE hvac

HVAC System Installation

Installation of new HVAC (Heating, Ventilation, and Air Conditioning) systems. This project requires a contractor to supply and install all necessary equipment.

place Regensburg, bayern

schedule 28 Apr

DE hvac

Ventilation System Cleaning, Disinfection, and Sampling

This tender is for the cleaning, disinfection, and sampling of ventilation systems. Contractors are required to perform all three tasks.

place Lohheide

schedule 7 May

DE hvac

Ventilation System Installation for Emergency Power System in Zwickau

Installation of a ventilation system as part of the 4th construction phase of an emergency power system at Haus 81 in HBK Zwickau. This project focuses on the ventilation component of the broader emergency power setup.

place Zwickau, Sachsen

schedule 10 Apr