HVAC System Installation for Laboratory and Other Spaces in Penzberg
Published 16 March 2026
Location
Penzberg, Bavaria, Germany
Deadline
31 March 2026
11 days remaining
Suggested bid value
~EUR 750,000
Source
ted
Description
This tender from Penzberg, Bavaria (Germany), involves the new installation of HVAC systems for a laboratory and other spaces. The core work includes installing a climate control unit for laboratory use (15,500 m³/h), a partial climate control unit for other rooms (3,500 m³/h), two point extraction systems (4,100 m³/h each), ventilation for two hazardous materials cabinets (1,600 m³/h each), a duct radial fan (7,600 m³/h), and a precision air conditioning cabinet. The ductwork installation in the attic is also part of the project.
The project timescale indicates a medium-sized installation, with work beginning in August 2026 and concluding in November 2027, lasting roughly 15 months. The variety of HVAC equipment, including laboratory-specific and hazardous materials ventilation, suggests a degree of technical complexity. Bidders should have demonstrable experience with laboratory HVAC systems to meet the specific requirements.
The procurement documents should be reviewed carefully to determine the evaluation criteria. Given the presence of hazardous material ventilation, compliance with stringent German regulations (e.g., regarding air quality and safety) will be essential.
Original description
This project involves the new installation of HVAC systems, including climate control units, exhaust systems, and ductwork for a laboratory and other spaces. Work starts August 2026 and ends November 2027.
Deutsch
Installation von HLK-Systemen für Labor und andere Räume in Penzberg
Dieses Projekt umfasst die Neuinstallation von HLK-Systemen, einschließlich Klimageräten, Absauganlagen und Luftkanälen für ein Labor und andere Räume. Die Arbeiten beginnen im August 2026 und enden im November 2027.
Français
Installation de systèmes CVC pour laboratoire et autres espaces à Penzberg
Ce projet comprend la nouvelle installation de systèmes CVC, y compris des unités de climatisation, des systèmes d'extraction et des conduits d'air pour un laboratoire et d'autres espaces. Les travaux débutent en août 2026 et se terminent en novembre 2027.