Install Air Dehumidifier System at Naussac Dam Plant
Published 24 March 2026
Location
Naussac, Centre-Val de Loire, France
Deadline
30 April 2026
37 days remaining
Suggested bid value
~EUR 85,000
Source
boamp
Description
This French public procurement opportunity concerns the complete installation of a new air dehumidifier system at the Naussac Dam plant building, located in the Centre-Val de Loire region. The project is specifically targeted at HVAC contractors. The contractor will need to handle all aspects of the installation, from initial assessment and preparation to the final commissioning and testing of the system.
Scale is difficult to assess precisely without knowing the dimensions of the dam plant building or the specifications of the required dehumidifier system. However, given the location in an existing industrial plant (a dam), contractors should anticipate potential challenges related to access, integration with existing infrastructure, and compliance with stringent safety regulations specific to dam environments. The deadline for submissions is approximately one month after publication, suggesting a moderately urgent timeline for proposal preparation.
Crucially, the absence of published CPV codes makes it difficult to determine the precise type and performance class of the system required. Contractors will need to make best guess and will need to investigate further, once the tender is published.
Original description
This project involves the installation of a new air dehumidifier system within the Naussac Dam plant building. Contractors will be responsible for the complete installation.
Deutsch
Installation eines Luftentfeuchtersystems im Naussac-Staudammwerk
Dieses Projekt umfasst die Installation eines neuen Luftentfeuchtersystems im Gebäude des Naussac-Staudamms. Die Auftragnehmer sind für die komplette Installation verantwortlich.
Français
Installation d'un système de déshumidificateur d'air à l'usine du barrage de Naussac
Ce projet concerne l'installation d'un nouveau système de déshumidification de l'air dans le bâtiment de l'usine du barrage de Naussac. Les entrepreneurs seront responsables de l'installation complète.