Installation of Industrial Gas and Compressed Air Systems
Published 9 March 2026
Location
Hamburg, Hamburg, Germany
Deadline
21 April 2026
32 days remaining
Suggested bid value
~EUR 750,000
Source
ted
Description
This German public works tender in Hamburg calls for the installation of industrial gas and compressed air systems. The project involves significant plumbing work, specifically the installation of 1,096 meters of copper piping. Beyond the piping, the project includes the procurement and installation of two oil-free screw compressors for compressed air generation, including air treatment systems. A gas management system is required, incorporating features like gas shortage and gas warning alerts, along with internal wiring. The project also includes the supply and installation of fittings for CO2 and nitrogen systems, including gas cabinets/cylinder connections. The construction work must be carried out between August 21, 2026 and May 31, 2027.
The scale of the project is moderate, considering the length of piping and the number of compressors. The integration of a gas management system and the handling of different gases (compressed air, CO2, nitrogen) suggests a degree of technical complexity. Contractors must ensure they have the necessary expertise in gas handling and safety regulations specific to Germany. The published CPV codes 45333000 (Plumbing and sanitary equipment installation work) confirm that a plumbing contractor would be expected to handle all necessary installation work and integration.
Given the detailed nature of the work description, prospective contractors should meticulously review the full tender documentation when available to precisely determine all requirements before deciding whether to bid.
Original description
Installation of gas and compressed air systems, including piping (1,096m copper), screw compressors, gas management systems, and related fittings for CO2, nitrogen, and compressed air. Work to be performed from August 21, 2026, to May 31, 2027.
Deutsch
Installation von Industrieellen Gas- und Druckluftsystemen
Installation von Gas- und Druckluftsystemen, einschließlich Rohrleitungen (1.096 m Kupfer), Schraubenkompressoren, Gasmanagementsystemen und zugehörigen Armaturen für CO2, Stickstoff und Druckluft. Die Arbeiten sind vom 21. August 2026 bis zum 31. Mai 2027 auszuführen.
Français
Installation de systèmes de gaz industriels et d'air comprimé
Installation de systèmes de gaz et d'air comprimé, y compris la tuyauterie (1 096 m de cuivre), les compresseurs à vis, les systèmes de gestion du gaz et les raccords associés pour le CO2, l'azote et l'air comprimé. Les travaux doivent être réalisés du 21 août 2026 au 31 mai 2027.