LCG Living Campus Building - Renovation of Blocks F-G with New Extension
Published 23 March 2026
Location
Antwerp, Antwerp, Belgium
Suggested bid value
~EUR 3,500,000
Source
bda
Description
This tender from Belgium (Antwerp) concerns the renovation of existing buildings (Blocks F and G) on the LCG Living Campus, combined with the construction of a new extension. As package 2A, it suggests other related works may be underway or planned separately. The tender falls under 'general construction', indicating the need for a contractor capable of managing multiple trades, including structural works, finishing, and building services installations. Due to the combination of renovation and new build, experience in both is likely advantageous.
The project's scale and complexity are difficult to assess without further details (CPV codes or value). However, the location in Antwerp and the reference to a 'Living Campus' suggests a potentially high-profile project, possibly involving specific sustainability requirements or design considerations related to modern educational or residential facilities. The renovation component will also require experience with existing building structures and potential challenges related to integrating the new extension.
The lack of a deadline or published contract value makes initial assessment challenging. Interested contractors should prioritize obtaining the tender documents to ascertain the precise scope of works, required certifications, and timeline before committing resources to a bid.
Original description
General construction contract for the renovation of blocks F-G and a new building extension at the LCG Living Campus. This is package 2A of the project.
Deutsch
LCG Living Campus Gebäude - Renovierung der Blöcke F-G mit Gebäudeerweiterung
Generalbauvertrag für die Renovierung der Blöcke F-G und einen Neubau am LCG Living Campus. Dies ist Paket 2A des Projekts.
Français
Bâtiment LCG Living Campus - Rénovation des blocs F-G avec nouvelle extension
Contrat de construction générale pour la rénovation des blocs F-G et une nouvelle extension de bâtiment au LCG Living Campus. Ceci est le lot 2A du projet.