Mühlacker Railway - Noise Barrier Wall Modification
Published 27 March 2026
Location
Mühlacker, Baden-Württemberg, Germany
Deadline
27 April 2026
31 days remaining
Suggested bid value
~EUR 350,000
Source
bund.de
Description
This German public tender from Mühlacker, Baden-Württemberg, requires a contractor to modify an existing noise barrier wall adjacent to a railway line. The core of the work is adapting the existing structure, implying demolition of portions, new construction or adaptation of existing components, and ensuring structural integrity. The practical tasks likely include materials procurement, on-site construction work, safety management due to the proximity of the railway, and adherence to German construction standards and regulations.
The absence of published value and CPV codes makes a precise assessment difficult. However, the focus on adapting an existing structure suggests a smaller scope than entirely new construction. The complexity is increased by the need to interface with and not disrupt railway operations, which necessitates close coordination with the railway operator and strict adherence to safety protocols. Given the deadline is one month from publication, contractors need to rapidly assess their capabilities and resources to prepare a compliant bid.
Given the focus on modification rather than complete new construction, one month deadline, location in Germany, and likely disruptions associated with railway operations, a quick mobilization and experienced team will likely be required to win.
Original description
This tender involves modifying a noise barrier wall on the railway line in Mühlacker. The contractor will need to adapt the existing wall structure.
Deutsch
ESTW Mühlacker - Anpassung Lärmschutzwand
Dieses Angebot umfasst die Anpassung einer Lärmschutzwand an der Bahnstrecke in Mühlacker. Der Auftragnehmer muss die bestehende Wandstruktur anpassen.
Français
ESTW Mühlacker - Modification du mur antibruit
Cet appel d'offres concerne la modification d'un mur antibruit sur la ligne de chemin de fer à Mühlacker. L'entrepreneur devra adapter la structure du mur existant.