DE General Open

New Build: Escape Staircase and Covered Walkway with Elevator to Cafeteria

Published 25 March 2026

location_on

Location

Wörth am Rhein, Rheinland-Pfalz, Germany

schedule

Deadline

31 March 2026

6 days remaining

auto_awesome

Suggested bid value

~EUR 450,000

source

Source

bund.de

Description

This tender concerns the construction of a new escape staircase and a covered walkway linking a school building to its cafeteria in Wörth am Rhein, Rheinland-Pfalz, Germany. The project explicitly includes the installation of an elevator within the new structure. As a 'general' trade tender, the successful contractor will likely be responsible for overall project management, coordination of subcontractors (if needed), and ensuring compliance with all relevant German building codes and regulations.

The inclusion of an elevator suggests a degree of complexity, requiring specialized installation and integration with the building's electrical and safety systems. The 'escape staircase' designation indicates stringent fire safety standards must be met. Given the limited information available, the exact scope (dimensions of the walkway, height of the staircase, elevator capacity, accessibility requirements, finish quality) is uncertain. The very short time between publication and deadline – less than a week, including a weekend – indicates a fast-track process, likely requiring an immediate response, established plans, and available resources for site visit and tender preparation.

Due to the urgent deadline, only contractors already familiar with similar projects and public procurement processes in Rheinland-Pfalz should consider bidding. A detailed assessment of the tender documents, particularly the specifications and drawings (not provided here), is crucial before deciding to participate.

Original description

Construction of a new escape staircase and a covered walkway connecting the school building to the cafeteria, including an elevator installation.

Deutsch

Neubau: Fluchttreppe und überdachter Verbindungsweg mit Aufzug zur Mensa

Bau einer neuen Fluchttreppe und eines überdachten Verbindungswegs zwischen dem Schulgebäude und der Mensa, einschließlich der Installation eines Aufzugs.

Français

Nouvelle construction : escalier de secours et passerelle couverte avec ascenseur vers la cantine

Construction d'un nouvel escalier de secours et d'une passerelle couverte reliant le bâtiment scolaire à la cantine, y compris l'installation d'un ascenseur.