Nuremberg Kongresshalle - Steelwork for Balconies and Anchor Devices
Published 17 March 2026
Location
Nürnberg, Bavaria, Germany
Suggested bid value
~EUR 350,000
Source
oev
Description
This German public procurement opportunity, located in Nuremberg, Bavaria, concerns structural steelwork at the Kongresshalle. The primary elements of the project are the fabrication and installation of roughly 39 steel balconies, totaling around 9,800 kg of steel. The work also includes fitting approximately 100 meters of railings and 127 square meters of grating onto these balconies. Additionally, the project specifies the installation of 93 anchor devices. The tender also includes pre-fabrication measurement and planning services.
Key considerations for contractors will be the Kongresshalle itself, which may present logistical challenges and necessitate careful coordination with other trades. The balcony fabrication requires precision and adherence to relevant German construction standards. The absence of a published deadline and CPV codes necessitates immediate investigation to ascertain bidding timelines and relevant product standards. Given the historical nature of the building, heritage considerations might impose stricter regulations.
Given the limited data, further due diligence is crucial. However, the presence of fabrication, installation, and planning components indicates the need for a multidisciplinary team. Contractors should assess their capacity to handle the steel tonnage and the specific requirements of working within an existing, potentially sensitive, structure.
Original description
This project involves the fabrication and installation of approximately 39 steel balconies (9800 kg steel, 100m railings, 127 m2 grating) and the installation of 93 anchor devices at the Kongresshalle. Includes measurement and planning services.
Deutsch
Kongresshalle Nürnberg - Stahlbauarbeiten für Balkone und Anschlageinrichtungen
Dieses Projekt umfasst die Fertigung und Montage von ca. 39 Stahlbalkonen (9800 kg Stahl, 100 m Geländer, 127 m2 Gitterroste) sowie die Montage von 93 Anschlageinrichtungen in der Kongresshalle. Inklusive Aufmaß- und Planungsleistungen.
Français
Kongresshalle de Nuremberg - Travaux d'acier pour balcons et dispositifs d'ancrage
Ce projet comprend la fabrication et l'installation d'environ 39 balcons en acier (9800 kg d'acier, 100 m de rampes, 127 m2 de caillebotis) et l'installation de 93 dispositifs d'ancrage à la Kongresshalle. Comprend les services de mesurage et de planification.