ES Electrical Open

Photovoltaic Self-Consumption System Installation on City Hall Building

Published 18 March 2026

location_on

Location

Santa María de Guía, Canary Islands, Spain

schedule

Deadline

13 April 2026

25 days remaining

euro

Estimated value

EUR 40,148.8

source

Source

placsp

Description

This Spanish public procurement opportunity concerns the installation of a photovoltaic (PV) system on the City Hall building in Santa María de Guía, Canary Islands. The project falls under the 'electrical' trade and requires the contractor to handle all aspects of the PV system installation, implying responsibility for design, procurement, installation, testing, and commissioning. A key factor to consider is the project's focus on 'self-consumption,' suggesting the system is intended primarily for on-site electricity usage rather than grid export, possibly involving battery storage solutions.

The financial scale is relatively small, with a published value of €40,148.8. This indicates a project likely involving a limited number of solar panels and a straightforward installation process on a single building. The deadline for submissions is April 13, 2026, providing a window of approximately four weeks to prepare a bid. Contractors should assess their current workload, resources in the Canary Islands region, and expertise in self-consumption PV systems to determine their competitiveness for this opportunity.

Given the limited information provided, further due diligence is necessary. Contractors must obtain the full tender documents from the procuring entity. This is essential for understanding the specific technical requirements, grid connection specifications, warranty obligations, and evaluation criteria. Pay close attention to environmental regulations, local building codes specific to Santa María de Guía, and any requirements related to the visual impact of the installation.

Original description

This project involves the installation of a photovoltaic (solar panel) system for self-consumption on the City Hall building. The contractor will be responsible for all aspects of the installation.

Deutsch

Installation einer Photovoltaik-Eigenverbrauchsanlage im Rathausgebäude

Dieses Projekt umfasst die Installation einer Photovoltaikanlage (Solarpanel) zur Eigenversorgung im Rathausgebäude. Der Auftragnehmer ist für alle Aspekte der Installation verantwortlich.

Français

Installation d'un système photovoltaïque d'autoconsommation sur le bâtiment de la mairie

Ce projet comprend l'installation d'un système photovoltaïque (panneaux solaires) pour l'autoconsommation sur le bâtiment de la mairie. L'entrepreneur sera responsable de tous les aspects de l'installation.

info

Spain's PLACSP portal may require a Spanish digital certificate (certificado electrónico) to view tender details. The link above takes you to the public search page where you can look up this tender by its reference number: 431/2026.

Related tenders

ES electrical

Installation of Solar Photovoltaic System for Energy Community

This tender is for the installation of a solar photovoltaic system for collective self-consumption by the Membrío energy community. The project is located in Membrío, Extremadura.

place Membrío, Extremadura

schedule 8 Apr

ES electrical

Photovoltaic Installation at Cruz Chiquita Nursery

Installation of a photovoltaic (solar panel) system at the Cruz Chiquita Nursery. The project is located in San Sebastián de La Gomera.

place San Sebastián de La Gomera, Canary Islands

schedule 26 Mar

ES electrical

New Efficient Lighting Installation for Port Area

Installation of new, energy-efficient lighting in the maritime zone of the Mineral Loading Dock at the Port. The project involves electrical work.

place Melilla, Melilla

schedule 14 Apr

ES electrical

Electrical Installation for Laundry Equipment at Ibiza Parador

Installation of a new electrical connection and protection panels for laundry equipment at the Parador de Turismo in Ibiza. This project requires electrical work.

place Madrid, Madrid

schedule 26 Mar

ES electrical

Power Upgrade at Substation for Desalination Plant

This project involves upgrading the power capacity at a substation (Abonado 3215) that serves the Mogán desalination plant. The work will take place in Mogán.

place Mogán, Canary Islands

schedule 10 Apr

ES electrical

Fire Alarm System Upgrade at Justice Center

This project involves upgrading the central fire alarm system at the Justice Center. Contractors are needed to migrate and update the existing system.

place Zaragoza, Aragon

schedule 6 Apr