Potable Water Reservoir Rehabilitation on Tower
Published 18 March 2026
Location
Jallais, Pays de la Loire, France
Deadline
22 May 2026
53 days remaining
Suggested bid value
~EUR 250,000
Source
boamp
Description
This public tender in Jallais, Pays de la Loire (France) concerns the complete rehabilitation of a potable water reservoir situated on a tower structure. Contractors will be responsible for all aspects of the restoration work. Given the location on a tower, expect significant logistical challenges related to access, materials handling, and worker safety. The lack of specific CPV codes makes it difficult to definitively categorize the work, but "general" trade suggests the contractor will need to manage multiple sub-trades, potentially including structural repairs, coating application, plumbing, and electrical work related to monitoring and control systems.
As this is a rehabilitation project, a thorough initial assessment of the existing structure will be critical. The project timeline allows just over two months for bid preparation, indicating a potentially complex undertaking requiring detailed planning and costing. Contractors should investigate the condition of the existing reservoir, any specific material requirements (e.g., potable water-safe coatings), and any required certifications or approvals related to working on elevated structures and with potable water systems. The deadline is strict so a prompt decision whether or not to tender is crucial.
The project's complexity is amplified by the vertical construction element. Ensure the bid includes adequate provisions for specialist access equipment like cranes or hoists and associated permits. Safety requirements for working at height and in confined spaces will be stringent. Evaluate all project risks carefully and adjust pricing accordingly. Local knowledge of suppliers and specialized sub-contractors will be beneficial.
Original description
This tender is for the rehabilitation of a potable water reservoir located on a tower structure. Contractors will be responsible for the complete restoration of the reservoir.