Pump Upgrade at Zeitz Wastewater Treatment Plant: Installation & Integration
Published 27 March 2026
Location
Elsteraue OT Göbitz, Sachsen-Anhalt, Germany
Deadline
5 May 2026
39 days remaining
Suggested bid value
~EUR 250,000
Source
bund.de
Description
The tender concerns an upgrade of pumps at the Zeitz wastewater treatment plant, located in Elsteraue OT Göbitz, Sachsen-Anhalt, Germany. As the 'electrical' trade is specified, the work likely involves a significant electrical component encompassing installation and integration of new pump control systems, wiring, switchgear, and connection to existing plant infrastructure. Bidders should anticipate tasks such as cable laying, control panel assembly and installation, PLC programming (potentially, depending on the control system specified), testing, and commissioning of the entire system. The integration aspect suggests the need for compatibility with existing monitoring and control infrastructure.
Without further information on the number or size of the pumps being upgraded, or the specific control systems involved, assessing the scale and complexity is difficult. However, the location in a wastewater treatment plant implies adherence to stringent environmental and safety regulations, typical for public sector projects in Germany. The deadline is approximately five weeks after publication, a relatively short timeframe, so a prompt assessment of the full tender documents will be necessary. The lack of a published value suggests further assessment of the ITT document is very important before spending time preparing a bid.
Original description
This project involves upgrading pumps at the Zeitz wastewater treatment plant. The work includes pump installation, electrical and control systems installation, integration, and commissioning.
Deutsch
Pumpen-Upgrade in der Kläranlage Zeitz: Installation & Integration
Dieses Projekt umfasst die Modernisierung von Pumpen in der Kläranlage Zeitz. Die Arbeiten umfassen die Pumpeninstallation, die Installation von Elektro- und Steuerungssystemen, die Integration und die Inbetriebnahme.
Français
Modernisation des pompes à la station d'épuration de Zeitz : Installation et intégration
Ce projet concerne la modernisation des pompes de la station d'épuration de Zeitz. Les travaux comprennent l'installation des pompes, l'installation des systèmes électriques et de contrôle, l'intégration et la mise en service.