Renovation of Amphitheater 2 in Building D at IUT Cachan
Published 17 March 2026
Location
Cachan, Ile-de-France, France
Deadline
14 April 2026
15 days remaining
Suggested bid value
~EUR 150,000
Source
boamp
Description
The "Renovation of Amphitheater 2 in Building D at IUT Cachan" tender concerns the general renovation of an existing amphitheater space within a university building. This suggests the work will likely include refurbishment of seating, flooring, walls, and possibly lighting and acoustic elements. Without specific CPV codes, it's difficult to pinpoint specialized requirements, but contractors should anticipate tasks common to interior renovation projects, such as plastering, painting, carpentry, and potentially electrical or mechanical upgrades if those systems are within the amphitheater's scope.
The location at IUT Cachan (part of Université Paris-Saclay) indicates this is a public sector project, subject to French public procurement regulations. The scale is implied to be limited to the amphitheater itself, suggesting a relatively small project compared to full building renovations. The deadline of April 14th, 2026, provides a limited window for bid preparation. Contractors should assess their capacity to meet this deadline given the need for site visits, document preparation, and potentially forming a consortium if specialist sub-contractors are required. As no value is published, contractors must carefully assess the project's likely costs to determine profitability.
Given the "general" trade description, successful bidders should have experience managing similar renovation projects in occupied buildings, minimizing disruption to university operations. Attention to environmental considerations, accessibility standards, and adherence to French building codes will be essential. It is also necessary to thoroughly investigate whether VAT needs to be included in the offer.
Original description
This tender is for the renovation of Amphitheater 2, located in Building D at the IUT Cachan site. The project involves general renovation work within the existing amphitheater space.