Rösa Floodplain - Earthworks Material Control Testing
Published 18 March 2026
Location
Muldestausee (Anhalt-Bitterfeld), Anhalt-Bitterfeld, Germany
Deadline
16 April 2026
28 days remaining
Suggested bid value
~EUR 35,000
Source
bund.de
Description
The "Rösa Floodplain - Earthworks Material Control Testing" tender, located in Muldestausee, Anhalt-Bitterfeld (Germany), focuses on providing material control testing services for earthworks related to a floodplain project. Given the presence of a controllable inlet structure, the earthworks are likely associated with the construction or modification of dams, levees, or similar water management infrastructure. This implies the testing will cover soil compaction, stability, permeability, and potentially chemical composition to ensure the earthworks meet stringent engineering specifications for flood control and water retention.
While the specific CPV codes and a value estimate are unavailable, the general "general" trade classification and the project's connection to a water management system suggest a moderately complex undertaking. Contractors should be prepared to perform a comprehensive range of geotechnical tests and provide detailed reporting according to German engineering standards (e.g., DIN standards). The deadline for submissions is April 16, 2026, allowing approximately one month for proposal preparation. Contractors should ascertain the required testing volume and reporting formats to properly assess the resource requirements before deciding to bid.
Original description
This tender is for material control testing of earthworks for the Rösa Floodplain project. The project involves a controllable inlet structure.
Deutsch
Flutungspolder Rösa - Materialkontrollprüfung Erdbau
Diese Ausschreibung betrifft die Materialkontrollprüfung von Erdarbeiten für das Flutungspolder Rösa Projekt. Das Projekt umfasst ein steuerbares Einlaufbauwerk.
Français
Plaine inondable de Rösa - Tests de contrôle des matériaux de terrassement
Cet appel d'offres concerne les tests de contrôle des matériaux de terrassement pour le projet de la plaine inondable de Rösa. Le projet comprend une structure d'entrée contrôlable.