Roundabout Construction on Rd 29 in La Garde
Published 9 March 2026
Location
La Garde, Provence-Alpes-Cote d'Azur, France
Suggested bid value
~EUR 750,000
Source
boamp
Description
This public procurement notice concerns the construction of a new roundabout in La Garde, France, specifically located on Rd 29 at its intersection with Rue Aspirant Albert Piault. The project scope encompasses a 150-meter section of the Rd 29, stretching from kilometer point 9.650 to 9.800. The primary trade involved is road construction. Contractors should anticipate works including earthworks, drainage, pavement construction, installation of signage and road markings, and potentially utilities relocation if present within the specified section. Given the intersection location, traffic management during construction will likely be a critical aspect.
The scale of the project, being a single roundabout on a relatively short road section, suggests a medium-sized civil engineering undertaking. While the absence of CPV codes and specific details limit precise assessment, the location indicates possible interfaces with existing urban infrastructure. Factors affecting complexity could include the management of existing traffic flows, utility diversions (if necessary), and adherence to local environmental regulations. Interested contractors should seek detailed tender documentation to ascertain definitive requirements regarding materials specifications, quality control, environmental protection measures, and potential penalties for delays.
Missing information includes the tender deadline and specific contract value, which necessitates further investigation by potentially interested contractors. The publication date indicates bidding will open around March 9, 2026.
Original description
Construction of a new roundabout on Rd 29 at the intersection with Rue Aspirant Albert Piault. The project covers the section of Rd 29 from Pr 9+650 to Pr 9+800.