Subway Station Elevator Upgrade - Steinstraße Station
Published 18 March 2026
Location
Düsseldorf, Nordrhein-Westfalen, Germany
Deadline
9 April 2026
21 days remaining
Suggested bid value
~EUR 450,000
Source
bund.de
Description
The public procurement tender concerns a complete elevator system replacement at the Steinstraße subway station in Düsseldorf. This involves the full removal of the existing elevator and the subsequent installation of a new, functional system. Contractors bidding should anticipate handling all aspects of the project, including demolition, disposal, installation, testing, and commissioning of the new elevator.
Based on the limited available information, specifically the 'general' trade classification, this project likely requires significant coordination with other trades or specialized subcontractors. The location within a functioning subway station suggests potential logistical challenges, including restricted access, noise limitations, and the need to minimize disruption to public transportation. The short turnaround time between publication and the deadline (approximately three weeks) indicates a need for quick evaluation and bid preparation.
Furthermore, the missing CPV codes suggest a preliminary review of the tender documents will be necessary to ascertain the precise technical specifications and any specific regulatory compliance requirements relevant to elevator installations in public transport environments within Nordrhein-Westfalen. The lack of a published contract value emphasizes the importance of a thorough cost assessment before submitting a bid.
Original description
This tender is for the replacement of the elevator system at the Steinstraße subway station. Contractors will be responsible for the complete removal and installation of a new elevator system.
Deutsch
U-Bahnhof Steinstraße - Erneuerung der Aufzugsanlage
Diese Ausschreibung betrifft den Austausch der Aufzugsanlage im U-Bahnhof Steinstraße. Die Auftragnehmer sind für den kompletten Ausbau und die Installation einer neuen Aufzugsanlage verantwortlich.
Français
Modernisation de l'ascenseur de la station de métro Steinstraße
Cet appel d'offres concerne le remplacement du système d'ascenseur à la station de métro Steinstraße. Les entrepreneurs seront responsables du retrait complet et de l'installation d'un nouveau système d'ascenseur.