Temporary Terminal 1 Departure/Exit Container Construction
Published 15 March 2026
Location
Salzburg, Salzburg, Austria
Suggested bid value
~EUR 750,000
Source
usp
Description
This tender concerns the construction of a temporary container structure at the departure/exit area of Terminal 1 in Salzburg Airport, Austria. As the 'general' trade is specified, the contractor will likely be responsible for the overall project, including coordinating various sub-trades (electrical, plumbing, etc.) related to container modification and integration. The 'temporary' nature suggests a defined lifespan and potentially specific dismantling or removal requirements after the terminal upgrade, which will need to be factored into the construction plan. The absence of a published deadline requires the contractor to promptly investigate the submission timeframe. The lack of CPV codes prevents a more precise determination of the specific work types included.
Original description
This project involves the construction of a temporary container structure for the departure/exit area of Terminal 1. The location is in Salzburg, Austria.
Deutsch
Provisorium Terminal 1 - Abflug/Ausreise - Containerbau
Dieses Projekt umfasst den Bau einer temporären Containerstruktur für den Abflug-/Ausreisebereich von Terminal 1. Der Standort ist in Salzburg, Österreich.
Français
Construction de conteneurs pour le terminal 1 temporaire - Départ/Sortie
Ce projet implique la construction d'une structure de conteneurs temporaire pour la zone de départ/sortie du terminal 1. L'emplacement est à Salzbourg, en Autriche.