Uninterruptible Power Supply (UPS) System Replacement for Incinerator
Published 16 March 2026
Location
Jülich, Nordrhein-Westfalen, Germany
Deadline
16 April 2026
28 days remaining
Suggested bid value
~EUR 80,000
Source
bund.de
Description
This electrical trade tender in Jülich, Nordrhein-Westfalen, Germany, requires contractors to replace an existing uninterruptible power supply (UPS) system serving an incinerator. The core work comprises dismantling and removal of the old UPS and subsequent installation of a new, likely pre-specified, UPS system. The absence of specific CPV codes or system specifications makes it difficult to fully assess complexity, but the critical nature of UPS systems for incinerator operations suggests high reliability and performance standards are likely. Contractors should anticipate rigorous testing and commissioning protocols after installation. Given the 30-day turnaround between publication and the deadline, potential bidders should prioritize quickly assessing their capacity to meet potential technical requirements and logistical constraints related to incinerator access and shutdown protocols. A site visit will likely be necessary to fully assess the physical constraints of the installation environment.
Original description
This project involves replacing the uninterruptible power supply (UPS) system that supports the incinerator. Contractors are needed to remove the old system and install a new one.
Deutsch
Erneuerung der USV-Anlage für den Verbrennungsofen
Dieses Projekt umfasst den Austausch der unterbrechungsfreien Stromversorgung (USV) für den Verbrennungsofen. Auftragnehmer werden benötigt, um das alte System zu entfernen und ein neues zu installieren.