Construction of a New BSL 3 Laboratory and Office Building
Published 16 March 2026
Suggested bid value
~EUR 3,500,000
Source
tenderned
Description
This Dutch tender seeks a general contractor to construct a new building comprising a Biosafety Level 3 (BSL 3) laboratory and associated office space. The building will be located adjacent to an existing structure. As a general contractor, you would be responsible for the complete construction project, including all necessary trades and sub-contractors to deliver a fully functional laboratory and office facility. The BSL 3 classification indicates stringent safety requirements for containment of biohazardous materials, implying specialized construction techniques, materials, and adherence to strict regulations throughout the build. The adjacency to an existing building adds another layer of complexity requiring careful coordination to minimize disruption and ensure structural integrity of both buildings.
The lack of specified deadlines and CPV codes, coupled with a publication date from the future, is unusual and could indicate a pre-tender announcement or incomplete information. The key consideration is the BSL 3 laboratory component. This mandates experience in specialized ventilation systems, airtight construction, specific waste management systems, and rigorous testing and certification procedures. Contractors without prior experience in BSL-rated facilities should carefully consider the learning curve and potential risks involved. Assuming the tender is genuine, prioritize a thorough review of the full tender documentation when available to fully assess the specific requirements and risks.
Original description
Construction of a new building including a BSL 3 laboratory and office space, adjacent to an existing building.
Deutsch
Bau eines neuen BSL 3 Labors und Bürogebäudes
Bau eines neuen Gebäudes mit einem BSL 3 Labor und Büroflächen, angrenzend an ein bestehendes Gebäude.
Français
Construction d'un nouveau laboratoire BSL 3 et d'un immeuble de bureaux
Construction d'un nouveau bâtiment comprenant un laboratoire BSL 3 et des bureaux, adjacent à un bâtiment existant.