Hospital Building III Remodeling, Expansion, and Superstructure
Published 11 March 2026
Location
Warszawa, PL911, Poland
Deadline
17 March 2026
Deadline passed
Estimated value
EUR 32,770,243.9
Source
ted
Description
This public tender concerns the remodeling, expansion, and superstructure of Hospital Building III at Grenadierów 51/59 in Warsaw, Poland. A key component of the work includes the demolition of the existing auditorium. The provided information points to a comprehensive construction project encompassing a wide range of trades, indicated by the extensive list of CPV codes. These codes cover general construction (45000000, 45110000), hospital buildings (45215140), mechanical and electrical installations (45300000, 45311200, 45331100, 45331220, 45332000, 45332200), and finishing works (45400000, 45440000, 45450000). Further details are available in the attached documents (Załącznik nr 1, 2, 3 i 4 do SWZ) which constitute the technical specification, design documentation and the contract draft.
The fixed contract value is estimated at EUR 32,770,243.9. Given the project scope (remodeling, expansion, superstructure within an operational hospital environment) and numerous trade categories, this tender suggests a large-scale and complex undertaking requiring strong project management capabilities and experience with similar healthcare projects. The deadline for submission is very short (6 days after publication), indicating that only firms with resources ready to go should apply.
Potential bidders should thoroughly review the provided attachments (especially the 'dokumentacja projektowa – załącznik nr 3 do SWZ') to fully understand the technical requirements, potential risks, and logistical challenges associated with this project. Particular attention should be paid to any specific requirements outlined in the contract draft (Załącznik nr 4 do SWZ).
Original description
Construction tender for the remodeling, expansion, and superstructure of Hospital Building III, including demolition of the existing auditorium. The project is located at Grenadierów 51/59 in Warsaw.
Deutsch
Umbau, Erweiterung und Aufbau von Krankenhausgebäude III
Bauauftrag für den Umbau, die Erweiterung und den Aufbau von Krankenhausgebäude III, einschließlich des Abrisses des bestehenden Auditoriums. Das Projekt befindet sich in der Grenadierów 51/59 in Warschau.
Français
Réaménagement, agrandissement et superstructure du Bâtiment III de l'Hôpital
Appel d'offres pour le réaménagement, l'agrandissement et la superstructure du bâtiment III de l'hôpital, y compris la démolition de l'auditorium existant. Le projet est situé à Grenadierów 51/59 à Varsovie.