Renewable Energy Infrastructure Construction for Energy Cluster Development
Published 16 March 2026
Location
PL219, Poland
Deadline
13 April 2026
24 days remaining
Suggested bid value
~EUR 4,500,000
Source
ted
Description
This Polish public procurement opportunity (Region PL219) concerns the construction of renewable energy infrastructure. The work involves the design, supply, installation, and commissioning of several renewable energy systems. Specifically, the project requires the installation of approximately 489 photovoltaic (PV) installations, 27 energy storage systems for electricity, and 331 air source heat pumps for central heating and domestic hot water. A separate lot involves a hydrogen energy storage system coupled with a PV installation.
The numerous CPV codes indicate a broad scope covering electrical work, heating and cooling equipment, and engineering design. The project appears relatively large, given the scale of PV and heat pump installations. The deadline for submissions is April 13, 2026, allowing approximately one month for proposal preparation. The absence of a published contract value necessitates careful cost estimation to ensure a competitive bid. The two separate lots suggest the possibility of bidding on one or both projects depending on specialized skills.
The project falls under the “general” trade category, indicating potential involvement from multiple subcontractors. Bidders should carefully assess their capacity to manage a project involving multiple dispersed installations and integrate diverse technologies.
Original description
This project involves the design, supply, installation, and commissioning of renewable energy sources, including photovoltaic installations, energy storage systems, and air source heat pumps.
Deutsch
Bau von erneuerbarer Energieinfrastruktur für die Entwicklung eines Energieclusters
Dieses Projekt umfasst die Planung, Lieferung, Installation und Inbetriebnahme von erneuerbaren Energiequellen, einschließlich Photovoltaikanlagen, Energiespeichersystemen und Luftwärmepumpen.
Français
Construction d'infrastructures d'énergies renouvelables pour le développement d'un cluster énergétique
Ce projet comprend la conception, la fourniture, l'installation et la mise en service de sources d'énergie renouvelables, notamment des installations photovoltaïques, des systèmes de stockage d'énergie et des pompes à chaleur air-air.